Productivity and efficiency
More than 20 injection molding machines with tonnage from 70T to 580T, also two-component and robotic.
Raw materials warehouse
200 types of polymers and 28 drying ovens to have material always ready and available for the different moulding cycles.
Specialized operators
Introduction of metal inserts into the mold before the start of the processing cycle in order to obtain completely finished parts at the end of the molding process.
Machining
The internal department can perform manual or CNC machining on the parts and guarantees the assembly of the single components, thus providing a finished and tested product, ready to use.